RNAS Yeovilton, Yeovil

RNAS Yeovilton, Yeovil

Sector : Civil Engineering

Client : AECOM

Value : £850,000.00

What we did:

The project was carried out in order to achieve compliance with the Crown Fire Standard.

The work required:

  • Supply and erection of 9 EWS tanks, 80 - 560m3 capacity.
  • Main augmentation works were carried out to achieve enhanced flow characteristics and the installation of a fire booster pump system, including the design and supply of the mechanical and electrical element of the works.
  • Pressure testing and chlorination of the new infrastructure.

Download case studyDownload case study

Return to Case Studies