Broken up concrete 

All is green for haul road

Part of this scheme was to install 2 new concrete semi buried humus tanks, each aproximatly 12m in diameter. The existing ground contained some redundant concrete drying beds, which had to be removed. 

There was also a requirement to install a temporary haul road, which would later become a permanent access route. With this in mind and with a view of saving on unnecessary imports of stone we setup our concrete crushing unit.

Having broken up the redundant beds we fed the resulting material through our unit, which provided ample material for the haul road and when our works were completed remained in place to form the sub base material for the permanent access.

Return to News Room

© Damar Group 2009. All Rights Reserved