Lechlade STW
Sector : Mechanical & Electrical Engineering
Client : Thames Water
Value : £103,065.00
What we did:
Interpose new aeration system with existing rotor to allow duty standby operation.
Install steel extension to bridge to allow installation of rotation pumps.
Install and cable rotation pumps.
Construction of concrete base and pathway for the installation of new blowers.
Modify existing rotor starters and switch fuse for new blower MCC .
Connect blower, install telemetry and monitor new MCC.