Cassington Sewage Treatment Works
Sector : Civil Engineering
Client : Thames Water
Value : £300,000.00
What we did:
Design and construction of a new inlet works screening and final effluent wash water system, within the original site parameters.
Existing equipment was failing and little or no screening of raw effluent was taking place.
Site surveys and calculations of flows were carried out in order to achieve a greater efficiency of the inlet works to enable the site to operate efficiently and be more cost effective.
The contract was undertaken with no interruptions to the works or stoppages of flows.