BROWSE DAMAR CASE STUDIES

Filter Case Studies


News Image 1
Bleddington Sewage Treatment Works

Hand dug and lay 50mm MDPE pipe work below ground from the humus distribution chamber to the periphery of both the humus and PST settlement vessels.

Sector: Mechanical & Electrical Engineering Full Case Study Read Story
News Image 2
Combe St Nicolas Sewage Treatment

Replacement of filter media to 2 gravity filter beds, including works to provide new arms, tiles and vents.

Sector: Mechanical & Electrical Engineering Full Case Study Read Story
News Image 3
Lechlade STW

Interpose new aeration system with existing rotor to allow duty standby operation.

Sector: Mechanical & Electrical Engineering Full Case Study Read Story
News Image 4
Maundown Water Treatment Works

Maundown Water Treatment Works is one of Wessex Water’s most Prestigious sites for the provision of drinking water from Wimbleball Reservoir.

Sector: Mechanical & Electrical Engineering Full Case Study Read Story
News Image 5
Poole Biofor Sewage Treatment Works

This current contract is for the refurbishment of 24 no Filter cells. This requires the decommissioning of the cell to allow the filter media to be removed.

Sector: Mechanical & Electrical Engineering Full Case Study Read Story
News Image 6
Princes Risborough

The construction of a new concrete pump chamber around an existing 600mm diameter live sewer.

Sector: Mechanical & Electrical Engineering Full Case Study Read Story
News Image 7
Sludge Dewatering Project

Working with Thames Water, Damar jointly developed a method to reduce sewage sludge tankering costs to primary settled sludge holding tanks.

Sector: Mechanical & Electrical Engineering Full Case Study Read Story
News Image 8
Balls Hill Pumping Station

Upgrade of an existing freshwater booster station whilst still maintaining flows to meet Client requirement.

Sector: Mechanical & Electrical Engineering Full Case Study Read Story
News Image 9
Clatworthy Reservoir

Construction of a new raw water booster station to augment gravity flows to Maudown WTW at times when reservoir levels are low

Sector: Mechanical & Electrical Engineering Full Case Study Read Story
News Image 10
Aston Le Walls Sewage Treatment Works

The project at Aston Le walls was to remove the original media and replace it with a new filter distribution mechanism.

Sector: Mechanical & Electrical Engineering Full Case Study Read Story

© Damar Group 2009. All Rights Reserved

Damar Group Limited

Pows Orchard
Midsomer Norton, Radstock
Bath & N.E Somerset
BA3 2HY

Email : info@damargroup.co.uk
Tel: 01761 408 060
Fax: 01761 411 771

Contact Us