Hand dug and lay 50mm MDPE pipe work below ground from the humus distribution chamber to the periphery of both the humus and PST settlement vessels.
The design and construction of a new inlet works screening and final effluent wash water system.
Replacement of filter media to 2 gravity filter beds, including works to provide new arms, tiles and vents.
The construction of a new 0.4 ml capacity single compartment reinforced
Interpose new aeration system with existing rotor to allow duty standby operation.
Maundown Water Treatment Works is one of Wessex Water’s most Prestigious sites for the provision of drinking water from Wimbleball Reservoir.
Installation of new EWS tank to supplement the site fire fighting facilities.
This current contract is for the refurbishment of 24 no Filter cells. This requires the decommissioning of the cell to allow the filter media to be removed.
The construction of a new concrete pump chamber around an existing 600mm diameter live sewer.
In 2007, Damar were awarded the two year framework agreement to undertake Reservoir Repair works within the Wessex Water Region.
This contract required working with Wessex Water to turn Sharpness Sewage Treatment Works into a facility that can import commercial sludge.
Working with Thames Water, Damar jointly developed a method to reduce sewage sludge tankering costs to primary settled sludge holding tanks.
Upgrade of an existing freshwater booster station whilst still maintaining flows to meet Client requirement.
The project was carried out in order to achieve compliance with the Crown Fire Standard.
Construction of a new raw water booster station to augment gravity flows to Maudown WTW at times when reservoir levels are low
The project was to achieve compliance with the water metering / usage and wastage at these 3 sites.
The project at Aston Le walls was to remove the original media and replace it with a new filter distribution mechanism.
The town of Princes Risborough has been identified as a potential growth area in respect of additional housing. To this end Thames Water are in the process of ensuring that their sewage treatment works are ready for the increased demand.